Lisgar Terrace Regeneration (Phase 4)

Lisgar Terrace in Hammersmith and Fulham is an inter-war development that Southern Housing Group built in 1928 to provide homes for those who needed it the most. Last year the regeneration of Lisgar Terrace (phase 4) began.

Regeneration

Starting from August 2017 we captured the development at Lisgar Terrace and are continuing to record the progress. The design and build will preserve the historic building whilst maintaining the character of the estate.

The time lapse video showcases the existing blocks stripped back to the shell and core.  Also, the rooftops raised to create an extension for additional bedroom space. As well as this there is a major internal refurbishment with the replacement of the windows to match the original design.

Time Lapse Video

Using time lapse to document the regeneration encourages engagement within the local community.  The residents can see for themselves the progress being made in a short 3 – 4 minutes video.

To read more about the project at Lisgar Terrace click here.