time lapse, time lapse uk, time lapse photography, time lapse video, construction, M20

M20 London Bound Slope Reinstatement – Blu 3

The scope of this project was to restore the structural integrity of the M20 London bound embankment following damage caused by extensive burrowing from rabbits. The embankment measures 376m in length.

The works comprised of granular replacement of the embankment slope, excavation, a full-depth reconstruction of the hard shoulder.

Blu-3 wanted to capture the slope reinstatement of the M20 embankment between Junction 8 and Junction 7 (London Bound) with time lapse for a visually appealing marketing tool and also to track progress. Filming of the slope reinstatement took over 4 months to complete. Watch the time lapse video below.

Oliver Nunn from Blu-3 said that “Time Lapse UK were providers of a high-quality product, knowledgeable operatives and quick to respond to any queries. We had a quick turn round on monthly videos that have made a great marketing tool and we were able to use the images to track progress of works with a visual back up.”